Triple
T8068023
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Law of the River |
E188293
|
entity |
| Predicate | includesInstrument |
P1393
|
FINISHED |
| Object |
Colorado River Storage Project Act
The Colorado River Storage Project Act is a U.S. federal law that authorized a system of dams, reservoirs, and related works on the Colorado River and its tributaries to provide water storage, hydroelectric power, and river regulation in the Upper Basin states.
|
E720174
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Colorado River Storage Project Act | Statement: [Law of the River, includesInstrument, Colorado River Storage Project Act]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Colorado River Storage Project Act Context triple: [Law of the River, includesInstrument, Colorado River Storage Project Act]
-
A.
Colorado River Basin Project Act
The Colorado River Basin Project Act is a 1968 U.S. federal law that authorized major water development projects in the Colorado River Basin, including the Central Arizona Project, to support water supply, irrigation, and regional growth in the American Southwest.
-
B.
Boulder Canyon Project Act
The Boulder Canyon Project Act is a 1928 U.S. federal law that authorized the construction of Hoover Dam and the All-American Canal, enabling large-scale water storage and hydroelectric power development on the Colorado River.
-
C.
Bonneville Project Act of 1937
The Bonneville Project Act of 1937 is a U.S. federal law that created the Bonneville Power Administration and established the framework for marketing and transmitting hydroelectric power from the Columbia River dams in the Pacific Northwest.
-
D.
Reclamation Projects Authorization and Adjustment Act of 1992
The Reclamation Projects Authorization and Adjustment Act of 1992 is a U.S. federal law that authorized, modified, and updated numerous Bureau of Reclamation water and related resource projects across the western United States.
-
E.
Colorado River Storage and Regulation System
The Colorado River Storage and Regulation System is a network of dams, reservoirs, and related infrastructure designed to manage, store, and control the flow of the Colorado River for water supply, flood control, and hydroelectric power generation.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Colorado River Storage Project Act Triple: [Law of the River, includesInstrument, Colorado River Storage Project Act]
Generated description
The Colorado River Storage Project Act is a U.S. federal law that authorized a system of dams, reservoirs, and related works on the Colorado River and its tributaries to provide water storage, hydroelectric power, and river regulation in the Upper Basin states.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Colorado River Storage Project Act Target entity description: The Colorado River Storage Project Act is a U.S. federal law that authorized a system of dams, reservoirs, and related works on the Colorado River and its tributaries to provide water storage, hydroelectric power, and river regulation in the Upper Basin states.
-
A.
Colorado River Basin Project Act
The Colorado River Basin Project Act is a 1968 U.S. federal law that authorized major water development projects in the Colorado River Basin, including the Central Arizona Project, to support water supply, irrigation, and regional growth in the American Southwest.
-
B.
Boulder Canyon Project Act
The Boulder Canyon Project Act is a 1928 U.S. federal law that authorized the construction of Hoover Dam and the All-American Canal, enabling large-scale water storage and hydroelectric power development on the Colorado River.
-
C.
Bonneville Project Act of 1937
The Bonneville Project Act of 1937 is a U.S. federal law that created the Bonneville Power Administration and established the framework for marketing and transmitting hydroelectric power from the Columbia River dams in the Pacific Northwest.
-
D.
Reclamation Projects Authorization and Adjustment Act of 1992
The Reclamation Projects Authorization and Adjustment Act of 1992 is a U.S. federal law that authorized, modified, and updated numerous Bureau of Reclamation water and related resource projects across the western United States.
-
E.
Colorado River Storage and Regulation System
The Colorado River Storage and Regulation System is a network of dams, reservoirs, and related infrastructure designed to manage, store, and control the flow of the Colorado River for water supply, flood control, and hydroelectric power generation.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca82b42674819086840efea12478e5 |
completed | March 30, 2026, 2:03 p.m. |
| NER | Named-entity recognition | batch_69cb3ff8a4fc8190a97fc7111ca7ec4d |
completed | March 31, 2026, 3:31 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69cd341a2d2081909e812361025dc1cb |
completed | April 1, 2026, 3:04 p.m. |
| NEDg | Description generation | batch_69cd36ecc1d88190a978f1d51b0e1382 |
completed | April 1, 2026, 3:17 p.m. |
| NED2 | Entity disambiguation (via description) | batch_69cd4e7822e48190bb573162f224bd8c |
completed | April 1, 2026, 4:57 p.m. |
Created at: March 30, 2026, 5:27 p.m.