Triple

T8062361
Position Surface form Disambiguated ID Type / Status
Subject Gore Bay E188155 entity
Predicate instanceOf P0 FINISHED
Object harbour community C4404 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: harbour community
Context triple: [Gore Bay, instanceOf, harbour community]
  • A. harbor
    A harbor is a sheltered body of water, often equipped with docks and facilities, where ships can anchor safely for loading, unloading, and protection from rough seas.
  • B. harbour expansion
    Harbour expansion is the planned enlargement and enhancement of a port’s physical infrastructure and operational capacity to accommodate increased maritime traffic, larger vessels, and associated economic activities.
  • C. community hub chosen
    A community hub is a central place, physical or virtual, where people gather to connect, share resources, collaborate, and participate in activities that support collective well-being and local engagement.
  • D. coastal harbour
    A coastal harbour is a sheltered area along a shoreline where the sea meets the land, providing safe anchorage and facilities for ships and boats to dock, load, and unload.
  • E. seaport
    A seaport is a coastal facility equipped with harbors, docks, and infrastructure to enable the loading, unloading, storage, and transfer of cargo and passengers between sea and land transportation.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca82b2f68881908c50560697e210da completed March 30, 2026, 2:03 p.m.
Created at: March 30, 2026, 5:26 p.m.