Triple
T8038442
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Snohomish River |
E187172
|
entity |
| Predicate | crossedBy |
P416
|
FINISHED |
| Object |
Interstate 5 (via estuary area near Everett)
Interstate 5 (via estuary area near Everett) is the segment of the major north–south West Coast freeway that passes through the low-lying estuarine landscape near Everett, Washington, connecting the city with the broader regional and interstate highway network.
|
E708651
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate 5 (via estuary area near Everett) | Statement: [Snohomish River, crossedBy, Interstate 5 (via estuary area near Everett)]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Interstate 5 (via estuary area near Everett) Context triple: [Snohomish River, crossedBy, Interstate 5 (via estuary area near Everett)]
-
A.
Interstate 5 in Federal Way
Interstate 5 in Federal Way is a major segment of the primary north–south interstate highway in Washington State, serving as a key transportation corridor through the city of Federal Way between Seattle and Tacoma.
-
B.
Interstate 5 near Salmon Creek, Washington
Interstate 5 near Salmon Creek, Washington is a major north–south freeway segment in southwestern Washington that serves as a key junction where traffic from Interstate 205 merges back into the primary I-5 corridor.
-
C.
Interstate 5 in Mission Bay area
Interstate 5 in the Mission Bay area is a major north–south freeway segment in San Diego that runs along the eastern edge of Mission Bay, connecting coastal neighborhoods with the broader regional and interstate highway network.
-
D.
Interstate 5 in Redding
Interstate 5 in Redding is a major north–south freeway corridor in Northern California that serves as a key transportation route through the city and connects it to regional and interstate destinations.
-
E.
Interstate 5 near Lebanon, Oregon
Interstate 5 near Lebanon, Oregon is a segment of the major north–south freeway in western Oregon that serves as a key junction and access point for regional routes in the Willamette Valley.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Interstate 5 (via estuary area near Everett) Triple: [Snohomish River, crossedBy, Interstate 5 (via estuary area near Everett)]
Generated description
Interstate 5 (via estuary area near Everett) is the segment of the major north–south West Coast freeway that passes through the low-lying estuarine landscape near Everett, Washington, connecting the city with the broader regional and interstate highway network.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Interstate 5 (via estuary area near Everett) Target entity description: Interstate 5 (via estuary area near Everett) is the segment of the major north–south West Coast freeway that passes through the low-lying estuarine landscape near Everett, Washington, connecting the city with the broader regional and interstate highway network.
-
A.
Interstate 5 in Federal Way
Interstate 5 in Federal Way is a major segment of the primary north–south interstate highway in Washington State, serving as a key transportation corridor through the city of Federal Way between Seattle and Tacoma.
-
B.
Interstate 5 near Salmon Creek, Washington
Interstate 5 near Salmon Creek, Washington is a major north–south freeway segment in southwestern Washington that serves as a key junction where traffic from Interstate 205 merges back into the primary I-5 corridor.
-
C.
Interstate 5 in Mission Bay area
Interstate 5 in the Mission Bay area is a major north–south freeway segment in San Diego that runs along the eastern edge of Mission Bay, connecting coastal neighborhoods with the broader regional and interstate highway network.
-
D.
Interstate 5 in Redding
Interstate 5 in Redding is a major north–south freeway corridor in Northern California that serves as a key transportation route through the city and connects it to regional and interstate destinations.
-
E.
Interstate 5 near Lebanon, Oregon
Interstate 5 near Lebanon, Oregon is a segment of the major north–south freeway in western Oregon that serves as a key junction and access point for regional routes in the Willamette Valley.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca82ae2d1081909dbfee42b41db419 |
completed | March 30, 2026, 2:03 p.m. |
| NER | Named-entity recognition | batch_69cb3f19a6b4819085e2887fb0c54d08 |
completed | March 31, 2026, 3:27 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69cc570090a48190b84ba8325563148e |
completed | March 31, 2026, 11:21 p.m. |
| NEDg | Description generation | batch_69cc58edb31881909b6efd2fbbc2480e |
completed | March 31, 2026, 11:29 p.m. |
| NED2 | Entity disambiguation (via description) | batch_69cc5cc2f71081909cb7c0c245368edb |
completed | March 31, 2026, 11:46 p.m. |
Created at: March 30, 2026, 5:23 p.m.