Triple

T8038442
Position Surface form Disambiguated ID Type / Status
Subject Snohomish River E187172 entity
Predicate crossedBy P416 FINISHED
Object Interstate 5 (via estuary area near Everett)
Interstate 5 (via estuary area near Everett) is the segment of the major north–south West Coast freeway that passes through the low-lying estuarine landscape near Everett, Washington, connecting the city with the broader regional and interstate highway network.
E708651 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate 5 (via estuary area near Everett) | Statement: [Snohomish River, crossedBy, Interstate 5 (via estuary area near Everett)]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Interstate 5 (via estuary area near Everett)
Context triple: [Snohomish River, crossedBy, Interstate 5 (via estuary area near Everett)]
  • A. Interstate 5 in Federal Way
    Interstate 5 in Federal Way is a major segment of the primary north–south interstate highway in Washington State, serving as a key transportation corridor through the city of Federal Way between Seattle and Tacoma.
  • B. Interstate 5 near Salmon Creek, Washington
    Interstate 5 near Salmon Creek, Washington is a major north–south freeway segment in southwestern Washington that serves as a key junction where traffic from Interstate 205 merges back into the primary I-5 corridor.
  • C. Interstate 5 in Mission Bay area
    Interstate 5 in the Mission Bay area is a major north–south freeway segment in San Diego that runs along the eastern edge of Mission Bay, connecting coastal neighborhoods with the broader regional and interstate highway network.
  • D. Interstate 5 in Redding
    Interstate 5 in Redding is a major north–south freeway corridor in Northern California that serves as a key transportation route through the city and connects it to regional and interstate destinations.
  • E. Interstate 5 near Lebanon, Oregon
    Interstate 5 near Lebanon, Oregon is a segment of the major north–south freeway in western Oregon that serves as a key junction and access point for regional routes in the Willamette Valley.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Interstate 5 (via estuary area near Everett)
Triple: [Snohomish River, crossedBy, Interstate 5 (via estuary area near Everett)]
Generated description
Interstate 5 (via estuary area near Everett) is the segment of the major north–south West Coast freeway that passes through the low-lying estuarine landscape near Everett, Washington, connecting the city with the broader regional and interstate highway network.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Interstate 5 (via estuary area near Everett)
Target entity description: Interstate 5 (via estuary area near Everett) is the segment of the major north–south West Coast freeway that passes through the low-lying estuarine landscape near Everett, Washington, connecting the city with the broader regional and interstate highway network.
  • A. Interstate 5 in Federal Way
    Interstate 5 in Federal Way is a major segment of the primary north–south interstate highway in Washington State, serving as a key transportation corridor through the city of Federal Way between Seattle and Tacoma.
  • B. Interstate 5 near Salmon Creek, Washington
    Interstate 5 near Salmon Creek, Washington is a major north–south freeway segment in southwestern Washington that serves as a key junction where traffic from Interstate 205 merges back into the primary I-5 corridor.
  • C. Interstate 5 in Mission Bay area
    Interstate 5 in the Mission Bay area is a major north–south freeway segment in San Diego that runs along the eastern edge of Mission Bay, connecting coastal neighborhoods with the broader regional and interstate highway network.
  • D. Interstate 5 in Redding
    Interstate 5 in Redding is a major north–south freeway corridor in Northern California that serves as a key transportation route through the city and connects it to regional and interstate destinations.
  • E. Interstate 5 near Lebanon, Oregon
    Interstate 5 near Lebanon, Oregon is a segment of the major north–south freeway in western Oregon that serves as a key junction and access point for regional routes in the Willamette Valley.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca82ae2d1081909dbfee42b41db419 completed March 30, 2026, 2:03 p.m.
NER Named-entity recognition batch_69cb3f19a6b4819085e2887fb0c54d08 completed March 31, 2026, 3:27 a.m.
NED1 Entity disambiguation (via context triple) batch_69cc570090a48190b84ba8325563148e completed March 31, 2026, 11:21 p.m.
NEDg Description generation batch_69cc58edb31881909b6efd2fbbc2480e completed March 31, 2026, 11:29 p.m.
NED2 Entity disambiguation (via description) batch_69cc5cc2f71081909cb7c0c245368edb completed March 31, 2026, 11:46 p.m.
Created at: March 30, 2026, 5:23 p.m.