Triple
T8031346
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | James Allport |
E186985
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | railway administrator |
C8521
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: railway administrator Context triple: [James Allport, instanceOf, railway administrator]
-
A.
railway infrastructure manager
A railway infrastructure manager is an entity responsible for the planning, construction, maintenance, operation, and safe management of railway tracks, signaling systems, and related fixed installations.
-
B.
railway worker
chosen
A railway worker is an individual responsible for the operation, maintenance, safety, and support services of trains and railway infrastructure.
-
C.
public railway
A public railway is a government- or publicly-owned rail transport system that provides scheduled passenger and/or freight services accessible to the general population, typically operating on standardized tracks and infrastructure.
-
D.
transport infrastructure operator
A transport infrastructure operator is an entity responsible for managing, maintaining, and regulating transportation networks and facilities such as roads, railways, ports, or airports to ensure safe and efficient movement of people and goods.
-
E.
railway industry body
A railway industry body is an organization that represents, coordinates, and sets standards or policies for companies and stakeholders involved in the rail transport sector.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca82ae2d1081909dbfee42b41db419 |
completed | March 30, 2026, 2:03 p.m. |
Created at: March 30, 2026, 5:22 p.m.