Triple
T802332
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Japanese submarine I-168 |
E17155
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | fleet submarine |
C3938
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: fleet submarine Context triple: [Japanese submarine I-168, instanceOf, fleet submarine]
-
A.
military submarine
chosen
A military submarine is a stealth-capable naval vessel designed to operate underwater for extended periods to conduct surveillance, reconnaissance, and combat missions.
-
B.
naval fleet
A naval fleet is a large, organized group of warships and support vessels operating together under a unified command to project maritime power and conduct naval operations.
-
C.
naval auxiliary ship
A naval auxiliary ship is a non-combat vessel that supports naval operations by providing services such as supply, repair, transport, and logistical assistance to combat ships and shore facilities.
-
D.
crewed submersible
A crewed submersible is a small, self-propelled underwater vehicle designed to safely carry people to significant depths for exploration, research, or intervention tasks.
-
E.
naval arsenal
A naval arsenal is a specialized military facility where warships are built, repaired, equipped, and supplied with weapons, ammunition, and other naval stores.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a49378b9c48190adbf5f62e5b7aca1 |
completed | March 1, 2026, 7:28 p.m. |
Created at: March 1, 2026, 7:38 p.m.