Triple

T8017370
Position Surface form Disambiguated ID Type / Status
Subject Ely Marina E186651 entity
Predicate instanceOf P0 FINISHED
Object mooring facility C16149 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: mooring facility
Context triple: [Ely Marina, instanceOf, mooring facility]
  • A. public boating facility
    A public boating facility is a designated area with infrastructure and services that provide public access to waterways for launching, docking, and maintaining recreational or commercial boats.
  • B. boatyard
    A boatyard is a waterside facility where boats and ships are built, repaired, maintained, and often stored on land.
  • C. maritime structure chosen
    A maritime structure is a man-made construction located in or near bodies of water, designed to support marine activities such as navigation, transportation, resource extraction, or coastal protection.
  • D. roadstead
    A roadstead is a sheltered stretch of water near the shore where ships can anchor safely, though not as protected as a harbor.
  • E. dry dock
    A dry dock is a narrow basin or vessel that can be flooded to allow a ship to be floated in, then drained to expose the hull for construction, maintenance, or repair.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca82ac7fc081909b1398cf025423af completed March 30, 2026, 2:03 p.m.
Created at: March 30, 2026, 5:20 p.m.