Triple

T7997635
Position Surface form Disambiguated ID Type / Status
Subject Gorona del Viento E186166 entity
Predicate instanceOf P0 FINISHED
Object hybrid power plant C8017 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: hybrid power plant
Context triple: [Gorona del Viento, instanceOf, hybrid power plant]
  • A. electric power station
    An electric power station is a facility where various primary energy sources are converted into electrical energy for distribution to homes, businesses, and industries.
  • B. hydroelectric power complex
    A hydroelectric power complex is an integrated facility that harnesses the energy of flowing or falling water—using dams, reservoirs, turbines, and generators—to produce and distribute electrical power.
  • C. renewable energy power station chosen
    A renewable energy power station is a facility that generates electricity from naturally replenishing resources such as sunlight, wind, water, or geothermal heat, converting them into usable power for distribution to consumers.
  • D. wind power plant
    A wind power plant is a facility that converts the kinetic energy of wind into electrical energy using multiple wind turbines and associated infrastructure.
  • E. hybrid powertrain technology
    Hybrid powertrain technology integrates an internal combustion engine with one or more electric motors and a battery system to optimize fuel efficiency, reduce emissions, and enhance vehicle performance through intelligent power management.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca829c6c308190ab05b43d234c52b2 completed March 30, 2026, 2:03 p.m.
Created at: March 30, 2026, 5:17 p.m.