Triple

T799552
Position Surface form Disambiguated ID Type / Status
Subject Port Jersey Marine Terminal E17098 entity
Predicate instanceOf P0 FINISHED
Object intermodal freight facility C82 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: intermodal freight facility
Context triple: [Port Jersey Marine Terminal, instanceOf, intermodal freight facility]
  • A. freight rail corridor
    A freight rail corridor is a designated railway route primarily used for the efficient, high-capacity movement of goods and cargo between industrial, commercial, and logistics hubs.
  • B. freight railroad
    A freight railroad is a rail transport system dedicated to moving goods and commodities—such as raw materials, manufactured products, and containers—using freight trains over a network of tracks.
  • C. transport hub chosen
    A transport hub is a central location where multiple modes or routes of transportation intersect, enabling the efficient transfer of passengers or goods between them.
  • D. freight railroad network
    A freight railroad network is an interconnected system of rail lines, terminals, and supporting infrastructure designed to transport goods and raw materials efficiently between industrial, commercial, and logistical hubs.
  • E. tram depot
    A tram depot is a specialized facility where trams are stored, maintained, and dispatched for service on a city's tram network.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a49378b9c48190adbf5f62e5b7aca1 completed March 1, 2026, 7:28 p.m.
Created at: March 1, 2026, 7:38 p.m.