Triple
T7983533
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Rosario |
E185630
|
entity |
| Predicate | isOnMajorTransportCorridor |
P51097
|
FINISHED |
| Object | true |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: true | Statement: [Rosario, isOnMajorTransportCorridor, true]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: isOnMajorTransportCorridor Context triple: [Rosario, isOnMajorTransportCorridor, true]
-
A.
hasMajorRailCorridor
Indicates that a location or region is traversed by a primary, high-capacity railway route used for significant passenger or freight transport.
-
B.
hasMajorTransportationRole
Indicates that an entity plays a primary or significant role in providing or supporting transportation services or infrastructure.
-
C.
isMajorTransportLinkIn
Indicates that a transport route or connection serves as a primary or significant transportation link within a specified area or region.
-
D.
hasMajorTransportInfrastructure
chosen
Indicates that a location possesses significant transportation facilities or networks, such as major roads, railways, ports, or airports, that support substantial movement of people or goods.
-
E.
hasMajorHighway
Indicates that a location or area is served by or directly connected to a major highway route.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca829a2cfc819083d591d58ec04075 |
completed | March 30, 2026, 2:03 p.m. |
| NER | Named-entity recognition | batch_69cb3c2a1aa881909c3cea280dff38f5 |
completed | March 31, 2026, 3:14 a.m. |
| PD | Predicate disambiguation | batch_69cb048009a08190b4c577208a9f8f76 |
completed | March 30, 2026, 11:17 p.m. |
Created at: March 30, 2026, 5:15 p.m.