Triple

T7980387
Position Surface form Disambiguated ID Type / Status
Subject Pro Git E185555 entity
Predicate subject P450 FINISHED
Object Git E34613 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Git | Statement: [Pro Git, subject, Git]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Git
Context triple: [Pro Git, subject, Git]
  • A. Git chosen
    Git is a widely used distributed version control system designed to efficiently track changes in source code and support collaborative software development.
  • B. Pro Git
    Pro Git is a comprehensive, freely available book that serves as a widely used guide to the Git version control system for developers of all levels.
  • C. GitHub
    GitHub is a widely used web-based platform for version control and collaborative software development, built around the Git system and popular among open-source and enterprise projects.
  • D. Bitbucket
    Bitbucket is a web-based platform for hosting Git repositories that provides source code management, collaboration tools, and integration with development workflows.
  • E. GitLab
    GitLab is a web-based DevOps platform that provides Git repository hosting along with integrated tools for source code management, CI/CD, and project collaboration.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca829851908190b4e03829353ee7c3 completed March 30, 2026, 2:03 p.m.
NER Named-entity recognition batch_69cb3c274ce48190854d389d43ce14b8 completed March 31, 2026, 3:14 a.m.
NED1 Entity disambiguation (via context triple) batch_69ccbe17811081909c19f18c853617af completed April 1, 2026, 6:41 a.m.
Created at: March 30, 2026, 5:14 p.m.