Triple

T7959997
Position Surface form Disambiguated ID Type / Status
Subject I-285 and I-85 interchange (Spaghetti Junction) E184837 entity
Predicate connectsRoad P11435 FINISHED
Object I-285 E34535 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: I-285 | Statement: [I-285 and I-85 interchange (Spaghetti Junction), connectsRoad, I-285]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: I-285
Context triple: [I-285 and I-85 interchange (Spaghetti Junction), connectsRoad, I-285]
  • A. I-275
    I-275 is an auxiliary Interstate Highway that forms part of the beltway system around the Detroit metropolitan area in southeastern Michigan.
  • B. I-235
    I-235 is an auxiliary Interstate Highway that serves as a bypass route around Wichita, Kansas.
  • C. Interstate 285 chosen
    Interstate 285 is the beltway encircling Atlanta, Georgia, serving as a major bypass and connector for multiple interstate highways around the metropolitan area.
  • D. Interstate 285
    Interstate 285 is a short auxiliary Interstate highway in North Carolina that serves as a connector route near Winston-Salem.
  • E. Interstate 385
    Interstate 385 is a major freeway in South Carolina that connects the city of Greenville with Interstate 26, serving as a key route between the Upstate region and Columbia/Charleston corridors.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca8293a2388190aace944d7ed9c0c0 completed March 30, 2026, 2:02 p.m.
NER Named-entity recognition batch_69cb3b8136448190890f007fb4fb7625 completed March 31, 2026, 3:12 a.m.
NED1 Entity disambiguation (via context triple) batch_69d56f68630081908564dca6c3c81f14 completed April 7, 2026, 8:56 p.m.
Created at: March 30, 2026, 5:12 p.m.