Triple
T795831
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Project Orion (nuclear pulse propulsion) |
E17017
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | interplanetary spacecraft concept |
C2826
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: interplanetary spacecraft concept Context triple: [Project Orion (nuclear pulse propulsion), instanceOf, interplanetary spacecraft concept]
-
A.
spacecraft
chosen
A spacecraft is a vehicle or device designed to travel beyond Earth's atmosphere for purposes such as exploration, communication, research, or transportation.
-
B.
space probe
A space probe is an unmanned spacecraft designed to travel beyond Earth's orbit to collect scientific data about other celestial bodies and the space environment.
-
C.
Mars mission engineering activity
Mars mission engineering activity encompasses the planning, design, testing, and integration of systems and technologies required to safely transport, land, and support missions on the Martian surface and in its orbit.
-
D.
space transportation system
A space transportation system is an integrated set of vehicles, infrastructure, and operations designed to move payloads and passengers between Earth and space or between locations in space.
-
E.
space communication project
A space communication project is an organized effort to design, develop, and operate systems that enable reliable data and signal exchange between spacecraft, satellites, and ground stations.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a49378b9c48190adbf5f62e5b7aca1 |
completed | March 1, 2026, 7:28 p.m. |
Created at: March 1, 2026, 7:38 p.m.