Triple

T795830
Position Surface form Disambiguated ID Type / Status
Subject Project Orion (nuclear pulse propulsion) E17017 entity
Predicate instanceOf P0 FINISHED
Object nuclear pulse propulsion system C6058 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: nuclear pulse propulsion system
Context triple: [Project Orion (nuclear pulse propulsion), instanceOf, nuclear pulse propulsion system]
  • A. plutonium implosion-type nuclear bomb
    A plutonium implosion-type nuclear bomb is a weapon that uses precisely timed conventional explosives to symmetrically compress a subcritical plutonium core into a supercritical state, initiating a rapid, uncontrolled nuclear chain reaction.
  • B. plutonium production reactor
    A plutonium production reactor is a nuclear reactor specifically designed and operated to irradiate uranium fuel and efficiently generate plutonium-239 for use in nuclear weapons or reactor fuel.
  • C. fully reusable launch system
    A fully reusable launch system is a space launch architecture in which all major components (such as boosters, upper stages, and spacecraft) are recovered, refurbished, and flown again, minimizing expendable hardware and reducing per-launch costs.
  • D. nuclear reactor
    A nuclear reactor is a controlled system that initiates, sustains, and regulates a nuclear fission chain reaction to produce heat, typically for generating electricity or powering ships.
  • E. nuclear weapon
    A nuclear weapon is a highly destructive explosive device that releases immense energy through nuclear fission, fusion, or a combination of both, causing catastrophic blast, heat, and radiation effects.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a49378b9c48190adbf5f62e5b7aca1 completed March 1, 2026, 7:28 p.m.
Created at: March 1, 2026, 7:38 p.m.