Triple
T7938394
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | OpenStack Heat |
E184335
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | orchestration service |
C11236
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: orchestration service Context triple: [OpenStack Heat, instanceOf, orchestration service]
-
A.
orchestration platform
chosen
An orchestration platform is a system that automates, coordinates, and manages complex workflows and services across multiple components, tools, and environments to ensure reliable and efficient operations.
-
B.
orchestra leader
An orchestra leader is the conductor responsible for interpreting the musical score, directing the musicians’ performance, and coordinating tempo, dynamics, and expression to create a unified rendition of a piece.
-
C.
opera orchestra
An opera orchestra is a specialized ensemble of musicians that performs in the orchestra pit to accompany and enhance operatic productions, integrating closely with singers and stage action.
-
D.
ballet orchestra
A ballet orchestra is a specialized ensemble of musicians that performs live music tailored to accompany and enhance the choreography and storytelling of a ballet production.
-
E.
scheduling service
A scheduling service is a system component responsible for planning, organizing, and managing the execution of tasks or events over time according to defined rules, priorities, and constraints.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca8290c21c8190906a5ca6fe2b03c4 |
completed | March 30, 2026, 2:02 p.m. |
Created at: March 30, 2026, 5:08 p.m.