Triple
T792163
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Bessemer, Alabama |
E16937
|
entity |
| Predicate | hasMajorHighway |
P385
|
FINISHED |
| Object | Interstate 459 |
E227874
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate 459 | Statement: [Bessemer, Alabama, hasMajorHighway, Interstate 459]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Interstate 459 Context triple: [Bessemer, Alabama, hasMajorHighway, Interstate 459]
-
A.
Interstate 459
chosen
Interstate 459 is a bypass loop around Birmingham, Alabama, that helps divert traffic from the city’s main interstate corridors.
-
B.
Interstate 49
Interstate 49 is a major north–south U.S. Interstate Highway running through multiple states in the central United States, including Missouri.
-
C.
Interstate 205
Interstate 205 is a major auxiliary Interstate Highway that serves as an eastern bypass of Portland, Oregon, connecting I-5 in Oregon to I-5 in Washington across the Columbia River.
-
D.
Interstate 55
Interstate 55 is a major north–south U.S. highway running from Louisiana to Illinois, connecting cities such as New Orleans, Memphis, and Chicago.
-
E.
Interstate 59
Interstate 59 is a major U.S. highway running from Louisiana to Georgia, serving as a key north–south transportation corridor through the Deep South.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a4936cb7448190914f5fe4b8d81607 |
completed | March 1, 2026, 7:28 p.m. |
| NER | Named-entity recognition | batch_69a4a798c7608190b9c79c52a1fe0859 |
completed | March 1, 2026, 8:54 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69ae6ad5cfe4819083cb536c5d521d5d |
completed | March 9, 2026, 6:38 a.m. |
Created at: March 1, 2026, 7:38 p.m.