Triple

T792163
Position Surface form Disambiguated ID Type / Status
Subject Bessemer, Alabama E16937 entity
Predicate hasMajorHighway P385 FINISHED
Object Interstate 459 E227874 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate 459 | Statement: [Bessemer, Alabama, hasMajorHighway, Interstate 459]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Interstate 459
Context triple: [Bessemer, Alabama, hasMajorHighway, Interstate 459]
  • A. Interstate 459 chosen
    Interstate 459 is a bypass loop around Birmingham, Alabama, that helps divert traffic from the city’s main interstate corridors.
  • B. Interstate 49
    Interstate 49 is a major north–south U.S. Interstate Highway running through multiple states in the central United States, including Missouri.
  • C. Interstate 205
    Interstate 205 is a major auxiliary Interstate Highway that serves as an eastern bypass of Portland, Oregon, connecting I-5 in Oregon to I-5 in Washington across the Columbia River.
  • D. Interstate 55
    Interstate 55 is a major north–south U.S. highway running from Louisiana to Illinois, connecting cities such as New Orleans, Memphis, and Chicago.
  • E. Interstate 59
    Interstate 59 is a major U.S. highway running from Louisiana to Georgia, serving as a key north–south transportation corridor through the Deep South.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a4936cb7448190914f5fe4b8d81607 completed March 1, 2026, 7:28 p.m.
NER Named-entity recognition batch_69a4a798c7608190b9c79c52a1fe0859 completed March 1, 2026, 8:54 p.m.
NED1 Entity disambiguation (via context triple) batch_69ae6ad5cfe4819083cb536c5d521d5d completed March 9, 2026, 6:38 a.m.
Created at: March 1, 2026, 7:38 p.m.