Triple

T7918801
Position Surface form Disambiguated ID Type / Status
Subject Zarya E183891 entity
Predicate builtUnderContractFor P29467 FINISHED
Object NASA E1870 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: NASA | Statement: [Zarya, builtUnderContractFor, NASA]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: NASA
Context triple: [Zarya, builtUnderContractFor, NASA]
  • A. NASA chosen
    NASA is the United States government agency responsible for the nation’s civilian space program and for aeronautics and aerospace research.
  • B. NASA Headquarters
    NASA Headquarters is the central administrative and executive office of the National Aeronautics and Space Administration, overseeing the agency’s programs, policies, and strategic direction.
  • C. NASA Science Mission Directorate
    The NASA Science Mission Directorate is the division of NASA responsible for planning and overseeing the agency’s science programs and missions that explore Earth, the solar system, and the universe.
  • D. NASA Mission Control
    NASA Mission Control is the operations center of the U.S. space agency responsible for monitoring, directing, and supporting human and robotic space missions.
  • E. NASA Space Task Group
    The NASA Space Task Group was the early NASA organization responsible for planning and managing the United States’ first human spaceflight efforts, including Project Mercury.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: builtUnderContractFor
Context triple: [Zarya, builtUnderContractFor, NASA]
  • A. originallyBuiltUnder
    Indicates that something was first constructed during the rule, authority, or administration of a particular person, group, or regime.
  • B. builtOn
    Indicates that one entity is constructed, developed, or established using another entity as its base, foundation, or underlying platform.
  • C. constructedUnder chosen
    Indicates that something was built, created, or assembled while subject to the authority, direction, or conditions imposed by a particular agent, rule, plan, or regime.
  • D. builtWithout
    Indicates that something was constructed or created in the absence of a particular component, material, tool, or condition.
  • E. builtAsPartOf
    Indicates that one entity was constructed as a component or subset of a larger, encompassing entity or project.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca828efbe48190bd48482650182e79 completed March 30, 2026, 2:02 p.m.
NER Named-entity recognition batch_69cb3a8fbbb48190b50def4941761a31 completed March 31, 2026, 3:07 a.m.
NED1 Entity disambiguation (via context triple) batch_69cb5aa3f75881908e5380b5d8f86ea6 completed March 31, 2026, 5:24 a.m.
PD Predicate disambiguation batch_69cae9316e98819080be7bf1a6ff92f1 completed March 30, 2026, 9:20 p.m.
Created at: March 30, 2026, 5:05 p.m.