Triple

T7916769
Position Surface form Disambiguated ID Type / Status
Subject El Quimbo Dam E183845 entity
Predicate upstreamFrom P5955 FINISHED
Object Betania Dam E181900 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Betania Dam | Statement: [El Quimbo Dam, upstreamFrom, Betania Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Betania Dam
Context triple: [El Quimbo Dam, upstreamFrom, Betania Dam]
  • A. Betania Dam chosen
    Betania Dam is a major hydroelectric dam and reservoir in Colombia, known for generating power and supporting irrigation and aquaculture in the Huila region.
  • B. Bariri Dam
    Bariri Dam is a hydroelectric and river regulation structure located on Brazil’s Tietê River, contributing to regional power generation and water management.
  • C. Itumbiara Dam
    Itumbiara Dam is a large hydroelectric dam in Brazil known for generating significant electricity and forming one of the country’s major artificial reservoirs.
  • D. Itezhi-Tezhi Dam
    Itezhi-Tezhi Dam is a major hydroelectric and water-regulation dam in Zambia that helps control flows and generate power along the Kafue River system, a key tributary of the Zambezi.
  • E. Rantembe Dam
    Rantembe Dam is a hydroelectric and irrigation dam in Sri Lanka that forms part of the Mahaweli River development scheme.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca828efbe48190bd48482650182e79 completed March 30, 2026, 2:02 p.m.
NER Named-entity recognition batch_69cb3a8e8b388190b5544eb5b8159e07 completed March 31, 2026, 3:07 a.m.
NED1 Entity disambiguation (via context triple) batch_69cc936b4d088190bfcfd3bc6c05f7e8 completed April 1, 2026, 3:39 a.m.
Created at: March 30, 2026, 5:05 p.m.