Triple

T7897159
Position Surface form Disambiguated ID Type / Status
Subject Perforce E183366 entity
Predicate instanceOf P0 FINISHED
Object centralized version control system C19784 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: centralized version control system
Context triple: [Perforce, instanceOf, centralized version control system]
  • A. SCM system
    An SCM system (Supply Chain Management system) is a software platform that plans, executes, and monitors the end-to-end flow of goods, information, and finances across the supply chain to optimize efficiency, cost, and service levels.
  • B. software development system chosen
    A software development system is an integrated environment of tools, processes, and infrastructure that supports the planning, creation, testing, deployment, and maintenance of software applications.
  • C. software build and distribution system
    A software build and distribution system automates compiling source code, packaging artifacts, and delivering them reliably to target environments or end users.
  • D. bug tracking system
    A bug tracking system is a software tool that records, organizes, and manages reported defects or issues throughout a product’s development and maintenance lifecycle.
  • E. division of the GNU Project
    A division of the GNU Project is an organizational unit within the GNU initiative that focuses on developing, maintaining, or coordinating a specific subset of GNU software, documentation, or related activities.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca828c474c8190a254d6499871eaff completed March 30, 2026, 2:02 p.m.
Created at: March 30, 2026, 5:01 p.m.