Triple

T7893910
Position Surface form Disambiguated ID Type / Status
Subject SmartArt graphics E183301 entity
Predicate instanceOf P0 FINISHED
Object diagram feature C23104 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: diagram feature
Context triple: [SmartArt graphics, instanceOf, diagram feature]
  • A. link diagram
    A link diagram is a planar projection of one or more intertwined loops (links) in three-dimensional space, with crossing information indicated to represent their topological structure.
  • B. architecturalFeature
    An architecturalFeature is a distinct physical or structural element of a building or built environment that contributes to its function, form, or aesthetic character.
  • C. Penrose diagram
    A Penrose diagram is a spacetime diagram used in general relativity that compactifies infinite regions to finite size, allowing the global causal structure of a spacetime to be visualized.
  • D. vector graphics editor
    A vector graphics editor is a software application used to create and manipulate images composed of scalable geometric shapes such as lines, curves, and polygons, allowing for resolution-independent artwork and precise design control.
  • E. architectural feature
    An architectural feature is a distinct structural or decorative element of a building or space that contributes to its function, aesthetics, or character.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca828c474c8190a254d6499871eaff completed March 30, 2026, 2:02 p.m.
Created at: March 30, 2026, 5:01 p.m.