Triple

T7890537
Position Surface form Disambiguated ID Type / Status
Subject M6 E183218 entity
Predicate notableSection P5600 FINISHED
Object Thelwall Viaduct E30175 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Thelwall Viaduct | Statement: [M6, notableSection, Thelwall Viaduct]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Thelwall Viaduct
Context triple: [M6, notableSection, Thelwall Viaduct]
  • A. Thelwall Viaduct chosen
    Thelwall Viaduct is a major motorway bridge in north-west England that carries the M6 over the River Mersey and surrounding waterways near Warrington.
  • B. Cummersdale Viaduct
    Cummersdale Viaduct is a railway bridge in Cumbria, England, carrying the Cumbrian Coast Line across the River Caldew near Carlisle.
  • C. Marple Viaduct
    Marple Viaduct is a historic railway viaduct in Marple, Greater Manchester, known for its impressive multi-arch design spanning the River Goyt.
  • D. Meldon Viaduct
    Meldon Viaduct is a historic 19th-century wrought-iron railway viaduct in Devon, England, notable for its dramatic height and scenic setting above the West Okement River.
  • E. Dent Head Viaduct
    Dent Head Viaduct is a historic stone railway viaduct in Cumbria, England, carrying trains through the scenic Yorkshire Dales on the Settle–Carlisle line.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca828c474c8190a254d6499871eaff completed March 30, 2026, 2:02 p.m.
NER Named-entity recognition batch_69cb39ee137081908e87e35016c3a176 completed March 31, 2026, 3:05 a.m.
NED1 Entity disambiguation (via context triple) batch_69cc63a63fe0819095778a12bf437cf4 completed April 1, 2026, 12:15 a.m.
Created at: March 30, 2026, 5 p.m.