Triple

T7887985
Position Surface form Disambiguated ID Type / Status
Subject Base of the Future modernization project E183152 entity
Predicate instanceOf P0 FINISHED
Object installation resilience initiative C2938 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: installation resilience initiative
Context triple: [Base of the Future modernization project, instanceOf, installation resilience initiative]
  • A. installation art
    Installation art is a conceptual class of site-specific, often immersive artworks that transform a space through the arrangement of objects, media, and sensory elements to create an experiential environment for viewers.
  • B. infrastructure
    Infrastructure is the foundational physical and organizational systems—such as transportation, utilities, communication networks, and public facilities—that enable a society or organization to function and grow.
  • C. infrastructure project chosen
    An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
  • D. infraorder
    An infraorder is a taxonomic rank below suborder and above superfamily used to group closely related organisms within an order based on shared evolutionary characteristics.
  • E. infrastructure facility
    An infrastructure facility is a physical installation or complex that provides essential services or support functions—such as transportation, utilities, communication, or public safety—necessary for the operation and development of a community or region.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca828af6e48190a06ee7010d8f0e64 completed March 30, 2026, 2:02 p.m.
Created at: March 30, 2026, 4:59 p.m.