Triple

T7887063
Position Surface form Disambiguated ID Type / Status
Subject Priyadarshini Jurala Project E183128 entity
Predicate instanceOf P0 FINISHED
Object multipurpose project C11834 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: multipurpose project
Context triple: [Priyadarshini Jurala Project, instanceOf, multipurpose project]
  • A. multimedia project
    A multimedia project is an integrated work that combines multiple forms of media—such as text, images, audio, video, and interactive elements—to communicate information or create an engaging experience.
  • B. collaborative project
    A collaborative project is a coordinated effort in which multiple individuals or groups work together, sharing responsibilities, resources, and expertise to achieve a common goal.
  • C. multi-purpose facility
    A multi-purpose facility is a versatile building or space designed to support a wide range of activities, events, and functions through adaptable layouts and shared resources.
  • D. multipurpose dam chosen
    A multipurpose dam is a large engineered barrier built across a river or stream to store and regulate water for multiple uses such as irrigation, hydropower generation, flood control, water supply, and recreation.
  • E. project
    A project is a temporary, goal-oriented endeavor composed of coordinated tasks and resources undertaken to create a unique product, service, or result within defined constraints.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca828af6e48190a06ee7010d8f0e64 completed March 30, 2026, 2:02 p.m.
Created at: March 30, 2026, 4:59 p.m.