Triple

T7866809
Position Surface form Disambiguated ID Type / Status
Subject Saturn IB E182635 entity
Predicate notableMission P68 FINISHED
Object Apollo 7 E46119 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Apollo 7 | Statement: [Saturn IB, notableMission, Apollo 7]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Apollo 7
Context triple: [Saturn IB, notableMission, Apollo 7]
  • A. Apollo 7 chosen
    Apollo 7 was NASA’s 1968 Earth-orbiting test mission that successfully proved the redesigned Apollo spacecraft’s systems and paved the way for subsequent lunar missions.
  • B. Apollo 6
    Apollo 6 was the second and final uncrewed test flight of NASA’s Saturn V rocket, launched in 1968 to validate the vehicle for subsequent crewed Apollo missions.
  • C. Apollo 5
    Apollo 5 was an uncrewed 1968 NASA mission that conducted the first orbital test of the Apollo Lunar Module in Earth orbit.
  • D. Apollo 9
    Apollo 9 was a 1969 crewed Earth-orbital mission in NASA’s Apollo program that tested the Lunar Module and key systems needed for the subsequent Moon landings.
  • E. Gemini 7
    Gemini 7 was a 1965 NASA crewed spacecraft mission that conducted a long-duration 14-day flight to study the effects of space travel on the human body and served as the passive target for the first crewed space rendezvous with Gemini 6A.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca82894d9081908a832bfce71a4714 completed March 30, 2026, 2:02 p.m.
NER Named-entity recognition batch_69cb38464274819080f182b53783fa84 completed March 31, 2026, 2:58 a.m.
NED1 Entity disambiguation (via context triple) batch_69cb5b5908a88190bc00f0d6dbde0b58 completed March 31, 2026, 5:27 a.m.
Created at: March 30, 2026, 4:54 p.m.