Triple

T7822518
Position Surface form Disambiguated ID Type / Status
Subject Chelan County E181164 entity
Predicate traversedBy P225 FINISHED
Object U.S. Route 97A E434723 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: U.S. Route 97A | Statement: [Chelan County, traversedBy, U.S. Route 97A]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: U.S. Route 97A
Context triple: [Chelan County, traversedBy, U.S. Route 97A]
  • A. U.S. Route 97 chosen
    U.S. Route 97 is a major north–south U.S. highway in the Pacific Northwest that runs through central Oregon and Washington, serving as a key regional transportation corridor.
  • B. U.S. Route 95A
    U.S. Route 95A is an alternate U.S. highway in western Nevada that branches from U.S. Route 95 to serve communities such as Fernley and Yerington.
  • C. State Route 99
    State Route 99 is a major north–south California highway running through the Central Valley and connecting cities such as Sacramento with other key urban and agricultural regions.
  • D. State Route 99
    State Route 99 is a major north–south highway in Washington State that runs through Seattle and serves as a key alternative to Interstate 5.
  • E. U.S. Route 199
    U.S. Route 199 is a U.S. highway in northern California and southern Oregon that connects U.S. Route 101 near Crescent City to Interstate 5 near Grants Pass, serving as a key route through the rugged interior.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca828153f48190bdb27ac46f8e0745 completed March 30, 2026, 2:02 p.m.
NER Named-entity recognition batch_69cafa095d7081908b3e492ce58b5d5f completed March 30, 2026, 10:32 p.m.
NED1 Entity disambiguation (via context triple) batch_69ce01c37978819090922f7fc273edc9 completed April 2, 2026, 5:42 a.m.
Created at: March 30, 2026, 4:41 p.m.