Triple

T7797268
Position Surface form Disambiguated ID Type / Status
Subject Michael Foale E180329 entity
Predicate spaceMission P68 FINISHED
Object STS-118 E408044 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: STS-118 | Statement: [Michael Foale, spaceMission, STS-118]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: STS-118
Context triple: [Michael Foale, spaceMission, STS-118]
  • A. STS-118 chosen
    STS-118 was a 2007 Space Shuttle Endeavour mission to the International Space Station that delivered and installed new station components and marked teacher-astronaut Barbara Morgan’s first spaceflight.
  • B. STS-110
    STS-110 was a 2002 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S0 truss segment, a key structural component of the station’s backbone.
  • C. STS-117
    STS-117 was a 2007 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S3/S4 truss segment and solar arrays as part of the station’s assembly.
  • D. STS-115
    STS-115 was a 2006 NASA Space Shuttle Atlantis mission that resumed International Space Station construction by delivering and installing a major truss segment and associated hardware.
  • E. STS-116
    STS-116 was a 2006 Space Shuttle Discovery mission to the International Space Station that delivered and reconfigured key structural and power components as part of the station’s assembly.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca827d22208190b4dc5aa680edcf5d completed March 30, 2026, 2:02 p.m.
NER Named-entity recognition batch_69cae982c3b48190a35afe655fb20d55 completed March 30, 2026, 9:22 p.m.
NED1 Entity disambiguation (via context triple) batch_69cb140684ec8190aef5d3cb2e0ea948 completed March 31, 2026, 12:23 a.m.
Created at: March 30, 2026, 4:32 p.m.