Triple

T7791521
Position Surface form Disambiguated ID Type / Status
Subject Tuzla E180190 entity
Predicate transportConnection P1298 FINISHED
Object D100 highway E663163 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: D100 highway | Statement: [Tuzla, transportConnection, D100 highway]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: D100 highway
Context triple: [Tuzla, transportConnection, D100 highway]
  • A. D100 highway chosen
    The D100 highway is a major east–west state road in Turkey that runs through key cities including İzmit, serving as an important intercity and regional transport route.
  • B. M10 highway
    The M10 highway is a major Russian federal road that connects Moscow and Saint Petersburg, passing through cities such as Tver.
  • C. M17 highway
    The M17 highway is a major north–south road in Bosnia and Herzegovina that forms part of the European route network and links key cities including Zenica.
  • D. N14 highway
    The N14 highway is a major South African national route connecting Pretoria and Johannesburg with the North West and Northern Cape provinces.
  • E. M-7 highway
    The M-7 highway is a major federal road in Russia that connects Moscow with key cities in the Volga region and further toward the Ural area, serving as an important eastward transport corridor.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca827d22208190b4dc5aa680edcf5d completed March 30, 2026, 2:02 p.m.
NER Named-entity recognition batch_69cae9375dcc8190a6cb696c02aeceb7 completed March 30, 2026, 9:20 p.m.
NED1 Entity disambiguation (via context triple) batch_69e4aca16a10819097bb8655c8c1a36d completed April 19, 2026, 10:21 a.m.
Created at: March 30, 2026, 4:30 p.m.