Triple
T7782988
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | John D. Rockefeller, Jr. Memorial Parkway |
E221569
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | protected corridor |
C1193
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: protected corridor Context triple: [John D. Rockefeller, Jr. Memorial Parkway, instanceOf, protected corridor]
-
A.
ceremonial corridor
A ceremonial corridor is a formal, often architecturally embellished passageway designed to frame and elevate processions, rituals, or symbolic movement through a space.
-
B.
museum corridor
A museum corridor is a long, connecting passageway within a museum that guides visitors between galleries while often displaying artworks or informational exhibits along its walls.
-
C.
covered walkway
chosen
A covered walkway is a roofed passage that provides sheltered pedestrian movement between locations, protecting users from weather while guiding circulation.
-
D.
transport corridor
A transport corridor is a designated route or geographic band that concentrates and connects major transportation infrastructure—such as roads, railways, ports, and logistics hubs—to facilitate efficient movement of people and goods between key locations.
-
E.
underground rail corridor
An underground rail corridor is a subsurface passageway engineered to safely guide trains between stations, housing tracks, utilities, and supporting infrastructure while minimizing surface disruption.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca83ebbef881909ac47f789145fef7 |
completed | March 30, 2026, 2:08 p.m. |
Created at: March 30, 2026, 4:22 p.m.