Triple
T7781251
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Tuticorin Thermal Power Station |
E221521
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | thermal power plant |
C14265
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: thermal power plant Context triple: [Tuticorin Thermal Power Station, instanceOf, thermal power plant]
-
A.
coal-fired power station
A coal-fired power station is an industrial facility that burns coal to produce steam, which drives turbines connected to generators to produce electricity, while emitting significant air pollutants and greenhouse gases.
-
B.
electric power station
chosen
An electric power station is a facility where various primary energy sources are converted into electrical energy for distribution to homes, businesses, and industries.
-
C.
wind power plant
A wind power plant is a facility that converts the kinetic energy of wind into electrical energy using multiple wind turbines and associated infrastructure.
-
D.
renewable energy power station
A renewable energy power station is a facility that generates electricity from naturally replenishing resources such as sunlight, wind, water, or geothermal heat, converting them into usable power for distribution to consumers.
-
E.
industrial plant
An industrial plant is a large-scale facility where raw materials are transformed through mechanical, chemical, or biological processes into finished or semi-finished products using specialized equipment and coordinated operations.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca83ebbef881909ac47f789145fef7 |
completed | March 30, 2026, 2:08 p.m. |
Created at: March 30, 2026, 4:21 p.m.