Triple

T7766029
Position Surface form Disambiguated ID Type / Status
Subject Norwich Cathedral E176147 entity
Predicate instanceOf P0 FINISHED
Object Norman cathedral C22824 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Norman cathedral
Context triple: [Norwich Cathedral, instanceOf, Norman cathedral]
  • A. bridge over the River Cam
    A bridge over the River Cam is a structure that spans the river to connect its banks, enabling pedestrians, cyclists, or vehicles to cross while often serving as a notable architectural and cultural landmark in the surrounding landscape.
  • B. episcopal palace
    An episcopal palace is the official residence and administrative center of a bishop or archbishop, typically associated with a cathedral and used for ecclesiastical governance and ceremonial functions.
  • C. Norman
    Norman is a conceptual class representing an individual person characterized by specific attributes (such as name, age, and occupation) and behaviors (such as communicating, working, and interacting with other entities) within a given domain.
  • D. Bishop of Ely
    The Bishop of Ely is a senior ecclesiastical leader in the Church of England who oversees the Diocese of Ely, providing spiritual, administrative, and pastoral leadership within that region.
  • E. Count of Boulogne
    The Count of Boulogne was a medieval noble title associated with the County of Boulogne in northern France, held by various influential lords who controlled this strategically important coastal region.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c69962923c8190ac74d28b4f9fe0a0 completed March 27, 2026, 2:51 p.m.
Created at: March 27, 2026, 4:09 p.m.