Triple

T7744824
Position Surface form Disambiguated ID Type / Status
Subject North Anna Nuclear Generating Station E175600 entity
Predicate totalNetElectricalCapacity_MWe P35295 FINISHED
Object approximately 1896 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: approximately 1896 | Statement: [North Anna Nuclear Generating Station, totalNetElectricalCapacity_MWe, approximately 1896]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: totalNetElectricalCapacity_MWe
Context triple: [North Anna Nuclear Generating Station, totalNetElectricalCapacity_MWe, approximately 1896]
  • A. totalElectricalCapacity_MWe
    Indicates the total electrical power generation capacity, measured in megawatts electric (MWe), that an entity can produce or supply.
  • B. netElectricalCapacity_MWe chosen
    Indicates the relationship specifying an entity’s net electrical power generation capacity, measured in megawatts electric (MWe), after accounting for internal power consumption.
  • C. grossElectricalCapacity_MWe
    Indicates the total electrical power output capacity of a generating unit, measured in megawatts electric (MWe), before accounting for internal power consumption or losses.
  • D. turbineCapacity
    Indicates the power-generating capacity or rated output of a turbine.
  • E. hydroelectricStationCapacity
    Indicates the maximum amount of electrical power that a hydroelectric station is capable of producing under specified conditions.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c69960b3588190a53aa590d31d9544 completed March 27, 2026, 2:51 p.m.
NER Named-entity recognition batch_69c70402169481909b219dc5f4a64b9b completed March 27, 2026, 10:26 p.m.
PD Predicate disambiguation batch_69c7016c4a748190a7012030edaefcee completed March 27, 2026, 10:15 p.m.
Created at: March 27, 2026, 4:07 p.m.