Triple

T774401
Position Surface form Disambiguated ID Type / Status
Subject Black Rock City E16355 entity
Predicate instanceOf P0 FINISHED
Object planned settlement C22 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: planned settlement
Context triple: [Black Rock City, instanceOf, planned settlement]
  • A. planned city chosen
    A planned city is an urban area whose layout, infrastructure, and land use are deliberately designed and constructed according to a comprehensive plan before significant settlement occurs.
  • B. oasis settlement
    An oasis settlement is a community established around a natural water source in an otherwise arid or desert region, relying on the oasis for agriculture, trade, and habitation.
  • C. urban-type settlement
    An urban-type settlement is a semi-urban locality that exhibits some characteristics of a town or small city—such as concentrated housing, infrastructure, and non-agricultural employment—without meeting all the criteria for full city status.
  • D. coastal settlement
    A coastal settlement is a community established along a sea or ocean shoreline, whose location, economy, and culture are strongly influenced by the adjacent marine environment.
  • E. Jewish settlement
    A Jewish settlement is a community or residential area established and inhabited primarily by Jewish people, often reflecting specific historical, religious, or political contexts.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a49369a0848190af883934cee3db4c completed March 1, 2026, 7:28 p.m.
Created at: March 1, 2026, 7:37 p.m.