Triple
T774051
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Rod Nam Dam Hua |
E16347
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Songkran ritual |
C4029
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Songkran ritual Context triple: [Rod Nam Dam Hua, instanceOf, Songkran ritual]
-
A.
pilgrimage festival
A pilgrimage festival is a religious or spiritual event in which individuals or groups travel to a sacred site at a specific time to participate in communal rituals, celebrations, and acts of devotion.
-
B.
New Year celebration
chosen
A New Year celebration is a festive event marking the transition from one year to the next, typically involving gatherings, countdowns, fireworks, and cultural or personal rituals of reflection and renewal.
-
C.
religious festival
A religious festival is a recurring, community-based celebration rooted in spiritual beliefs and traditions, marked by rituals, ceremonies, and social gatherings that honor deities, sacred events, or religious values.
-
D.
harvest festival
A harvest festival is a communal celebration held at the end of the growing season to give thanks for and enjoy the gathered crops through feasting, rituals, and cultural traditions.
-
E.
ceremonial bridge
A ceremonial bridge is a specially designed structure used primarily for symbolic, ritual, or commemorative crossings during formal events rather than for everyday transportation.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a49369a0848190af883934cee3db4c |
completed | March 1, 2026, 7:28 p.m. |
Created at: March 1, 2026, 7:37 p.m.