Triple
T7733880
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Imperial College Business School |
E175331
|
entity |
| Predicate | accreditation |
P117
|
FINISHED |
| Object | AMBA |
E3324
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: AMBA | Statement: [Imperial College Business School, accreditation, AMBA]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: AMBA Context triple: [Imperial College Business School, accreditation, AMBA]
-
A.
AMBA
chosen
AMBA (the Association of MBAs) is a leading international accreditation body that evaluates and endorses the quality of postgraduate business education programs worldwide.
-
B.
Multibus
Multibus is an early Intel-developed computer bus standard widely used in 1980s workstations and embedded systems for modular expansion and peripheral connectivity.
-
C.
ARM
ARM is a family of energy-efficient RISC processor architectures widely used in mobile devices, embedded systems, and increasingly in laptops and servers.
-
D.
ARM
ARM is the three-letter International Olympic Committee country code representing Armenia in the Olympic Games.
-
E.
ARM
ARM is a South African diversified mining and minerals company involved in the exploration and production of commodities such as iron ore, manganese, coal, copper, and platinum group metals.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c6995e912c81909a49a2657103f786 |
completed | March 27, 2026, 2:51 p.m. |
| NER | Named-entity recognition | batch_69c70339c4b481909a56ae13f501e794 |
completed | March 27, 2026, 10:22 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69c8b534b6588190885db4632b97775f |
completed | March 29, 2026, 5:14 a.m. |
Created at: March 27, 2026, 4:06 p.m.