Triple
T7728374
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Krzysztof Penderecki |
E175189
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Polish conductor |
C6051
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Polish conductor Context triple: [Krzysztof Penderecki, instanceOf, Polish conductor]
-
A.
orchestra leader
chosen
An orchestra leader is the conductor responsible for interpreting the musical score, directing the musicians’ performance, and coordinating tempo, dynamics, and expression to create a unified rendition of a piece.
-
B.
Czech composer
A Czech composer is a musician from the historical lands of Bohemia, Moravia, or Czech Silesia who creates original musical works that often reflect Czech cultural, folk, and national traditions.
-
C.
Soviet composer
A Soviet composer is a musician who created original works of music within the cultural, political, and institutional framework of the Soviet Union, often balancing artistic expression with state ideology and censorship.
-
D.
Polish diplomat
A Polish diplomat is an official representative of Poland who conducts negotiations, fosters international relations, and protects Polish interests and citizens abroad.
-
E.
Polish military leader
A Polish military leader is a high-ranking commander from Poland responsible for planning, directing, and overseeing military operations and the strategic use of armed forces in defense of the nation.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c6995e912c81909a49a2657103f786 |
completed | March 27, 2026, 2:51 p.m. |
Created at: March 27, 2026, 4:06 p.m.