Triple

T7722573
Position Surface form Disambiguated ID Type / Status
Subject OV-102 E175048 entity
Predicate notableMission P68 FINISHED
Object STS-93 E384048 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: STS-93 | Statement: [OV-102, notableMission, STS-93]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: STS-93
Context triple: [OV-102, notableMission, STS-93]
  • A. STS-93 chosen
    STS-93 was a 1999 NASA Space Shuttle Columbia mission notable for deploying the Chandra X-ray Observatory, one of NASA’s Great Observatories.
  • B. STS-97
    STS-97 was a Space Shuttle Endeavour mission in 2000 that delivered and installed the first set of U.S.-built solar arrays to the International Space Station, significantly increasing the station’s power capacity.
  • C. STS-99
    STS-99 was a Space Shuttle Endeavour mission in 2000 that conducted the Shuttle Radar Topography Mission to create a highly detailed 3D map of most of Earth’s land surface.
  • D. STS-73
    STS-73 was a 1995 Space Shuttle Columbia mission focused on microgravity research in the United States Microgravity Laboratory-2 (USML-2).
  • E. STS-96
    STS-96 was a 1999 NASA Space Shuttle Discovery mission that performed the first docking with the International Space Station after its initial assembly flights, delivering supplies and equipment.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c6995d541c81909eaa646b1a8369a9 completed March 27, 2026, 2:51 p.m.
NER Named-entity recognition batch_69c702f1786881908b025d8986e5f1fa completed March 27, 2026, 10:21 p.m.
NED1 Entity disambiguation (via context triple) batch_69c988f902548190a3db57b4b6debf6c completed March 29, 2026, 8:18 p.m.
Created at: March 27, 2026, 4:05 p.m.