Triple

T7722472
Position Surface form Disambiguated ID Type / Status
Subject STS E175046 entity
Predicate hasNotableExample P1259 FINISHED
Object STS-107 E35817 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: STS-107 | Statement: [STS, hasNotableExample, STS-107]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: STS-107
Context triple: [STS, hasNotableExample, STS-107]
  • A. STS-107 chosen
    STS-107 was the final mission of Space Shuttle Columbia, tragically ending in 2003 when the orbiter disintegrated during reentry, killing all seven astronauts aboard.
  • B. STS-51L
    STS-51L was the ill-fated 1986 Space Shuttle Challenger mission that ended in disaster shortly after launch, leading to the deaths of its seven crew members and major reforms in NASA’s spaceflight program.
  • C. STS-51-L
    STS-51-L was the ill-fated 1986 Space Shuttle Challenger mission that ended in disaster shortly after launch, resulting in the loss of all seven crew members.
  • D. STS-77
    STS-77 was a 1996 NASA Space Shuttle Endeavour mission focused on microgravity research and technology demonstrations in low Earth orbit.
  • E. STS-97
    STS-97 was a Space Shuttle Endeavour mission in 2000 that delivered and installed the first set of U.S.-built solar arrays to the International Space Station, significantly increasing the station’s power capacity.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c6995d541c81909eaa646b1a8369a9 completed March 27, 2026, 2:51 p.m.
NER Named-entity recognition batch_69c702f1786881908b025d8986e5f1fa completed March 27, 2026, 10:21 p.m.
NED1 Entity disambiguation (via context triple) batch_69c8b51b612881909f20a6b777db348c completed March 29, 2026, 5:14 a.m.
Created at: March 27, 2026, 4:05 p.m.