Triple

T7718541
Position Surface form Disambiguated ID Type / Status
Subject Moses–Saunders Power Dam E174947 entity
Predicate instanceOf P0 FINISHED
Object cross-border power station C19469 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: cross-border power station
Context triple: [Moses–Saunders Power Dam, instanceOf, cross-border power station]
  • A. cross-border institution
    A cross-border institution is an organization or entity that operates across national boundaries, coordinating policies, activities, or services between multiple countries or jurisdictions.
  • B. cross-border area
    A cross-border area is a geographic region that spans across the boundaries of two or more countries, where social, economic, environmental, and political interactions occur and are often managed through cooperative arrangements.
  • C. cross-border terminal
    A cross-border terminal is a transportation facility located at or near an international boundary that consolidates, processes, and transfers passengers or freight between different countries’ transport networks while handling customs, immigration, and regulatory controls.
  • D. electric power station
    An electric power station is a facility where various primary energy sources are converted into electrical energy for distribution to homes, businesses, and industries.
  • E. hydroelectric power complex chosen
    A hydroelectric power complex is an integrated facility that harnesses the energy of flowing or falling water—using dams, reservoirs, turbines, and generators—to produce and distribute electrical power.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c6995c463c8190a14458036249d419 completed March 27, 2026, 2:51 p.m.
Created at: March 27, 2026, 4:05 p.m.