Triple
T7718541
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Moses–Saunders Power Dam |
E174947
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | cross-border power station |
C19469
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: cross-border power station Context triple: [Moses–Saunders Power Dam, instanceOf, cross-border power station]
-
A.
cross-border institution
A cross-border institution is an organization or entity that operates across national boundaries, coordinating policies, activities, or services between multiple countries or jurisdictions.
-
B.
cross-border area
A cross-border area is a geographic region that spans across the boundaries of two or more countries, where social, economic, environmental, and political interactions occur and are often managed through cooperative arrangements.
-
C.
cross-border terminal
A cross-border terminal is a transportation facility located at or near an international boundary that consolidates, processes, and transfers passengers or freight between different countries’ transport networks while handling customs, immigration, and regulatory controls.
-
D.
electric power station
An electric power station is a facility where various primary energy sources are converted into electrical energy for distribution to homes, businesses, and industries.
-
E.
hydroelectric power complex
chosen
A hydroelectric power complex is an integrated facility that harnesses the energy of flowing or falling water—using dams, reservoirs, turbines, and generators—to produce and distribute electrical power.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c6995c463c8190a14458036249d419 |
completed | March 27, 2026, 2:51 p.m. |
Created at: March 27, 2026, 4:05 p.m.