Triple

T7717370
Position Surface form Disambiguated ID Type / Status
Subject Interstate Highways in Massachusetts E174918 entity
Predicate innerBeltFunction P78312 FINISHED
Object Interstate 95 in Massachusetts E27094 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate 95 in Massachusetts | Statement: [Interstate Highways in Massachusetts, innerBeltFunction, Interstate 95 in Massachusetts]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Interstate 95 in Massachusetts
Context triple: [Interstate Highways in Massachusetts, innerBeltFunction, Interstate 95 in Massachusetts]
  • A. Interstate 95 in Maine
    Interstate 95 in Maine is the primary north–south highway corridor in the state, carrying regional and long-distance traffic between New Hampshire and the Canadian border.
  • B. Interstate 93 in Massachusetts
    Interstate 93 in Massachusetts is a major north–south highway that runs from Boston through its suburbs toward New Hampshire, serving as a key commuter and regional transportation corridor.
  • C. Interstate 95 (Massachusetts) chosen
    Interstate 95 (Massachusetts) is a major north–south highway forming part of the primary regional beltway around Greater Boston and serving as a key route for both local and interstate travel.
  • D. Interstate 95 in Pennsylvania
    Interstate 95 in Pennsylvania is a major north–south highway corridor that runs through the Philadelphia metropolitan area, connecting the state to other parts of the East Coast.
  • E. Interstate 95 in Burlington, Massachusetts
    Interstate 95 in Burlington, Massachusetts is a key segment of the Boston-area beltway that serves as a major regional highway corridor connecting suburban communities and intersecting several important routes.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: innerBeltFunction
Context triple: [Interstate Highways in Massachusetts, innerBeltFunction, Interstate 95 in Massachusetts]
  • A. isOnInnerCircle
    Indicates that one entity belongs to the innermost or most central circle or layer of another entity.
  • B. usesBeltSystem
    Indicates that a subject employs a structured belt-ranking system (e.g., colored belts) to denote levels of skill, progress, or status.
  • C. innerBoundaryRegion
    Indicates that one region serves as the inner boundary or enclosed area within another region or geometric entity.
  • D. innerHaloRadius
    Indicates the radius measurement of the inner boundary of a halo-like structure surrounding an object.
  • E. innerRingInclination
    Indicates the angle between the inner ring’s plane and a reference plane, describing how much the inner ring is tilted.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c6995c463c8190a14458036249d419 completed March 27, 2026, 2:51 p.m.
NER Named-entity recognition batch_69c702ebb7448190ae8d47fe0cbb0907 completed March 27, 2026, 10:21 p.m.
NED1 Entity disambiguation (via context triple) batch_69c925264798819096e154ffa23ddfae completed March 29, 2026, 1:12 p.m.
PD Predicate disambiguation batch_69c701683dec8190be9861e592aa8ce0 completed March 27, 2026, 10:15 p.m.
PDg Predicate description generation batch_69c702e9a32081909a153190a62af426 completed March 27, 2026, 10:21 p.m.
Created at: March 27, 2026, 4:05 p.m.