Triple
T770433
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Rubinstein bargaining model |
E16268
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | bargaining model |
C324
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: bargaining model Context triple: [Rubinstein bargaining model, instanceOf, bargaining model]
-
A.
bargaining solution concept
A bargaining solution concept is a formal rule or principle that specifies how two or more parties should divide the benefits of cooperation given their feasible payoffs and disagreement outcomes.
-
B.
multilateral negotiation process
A multilateral negotiation process is a structured series of interactions among three or more parties with differing interests, aimed at reaching mutually acceptable agreements through communication, bargaining, and compromise.
-
C.
ultimatum
An ultimatum is a final, non-negotiable demand or set of terms issued to another party, typically backed by a threat of negative consequences if not accepted.
-
D.
business cartel
A business cartel is a group of independent companies that secretly or explicitly collude to control prices, limit competition, or manipulate markets for mutual benefit.
-
E.
theoretical model
chosen
A theoretical model is an abstract, simplified representation of a system or phenomenon used to explain, predict, or understand its behavior based on underlying principles and assumptions.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a49369a0848190af883934cee3db4c |
completed | March 1, 2026, 7:28 p.m. |
Created at: March 1, 2026, 7:37 p.m.