Triple
T7702264
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Russell Carhouse |
E174527
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | streetcar maintenance facility |
C4156
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: streetcar maintenance facility Context triple: [Russell Carhouse, instanceOf, streetcar maintenance facility]
-
A.
streetcar stop
A streetcar stop is a designated location along a streetcar line where passengers can safely board and alight from streetcars, often marked with signage, shelters, or platforms.
-
B.
maintenance facility
chosen
A maintenance facility is a dedicated location equipped with tools, resources, and personnel for inspecting, repairing, and servicing equipment, vehicles, or infrastructure to ensure their proper functioning and longevity.
-
C.
streetcar model
A streetcar model is a scaled representation of a tram or streetcar vehicle, typically used for display, education, or hobbyist model railroading.
-
D.
streetcar system
A streetcar system is an urban public transit network that operates rail vehicles on fixed tracks, typically embedded in city streets, to transport passengers along defined routes.
-
E.
streetcar design
Streetcar design is the conceptual planning and configuration of a rail-guided urban transit vehicle’s form, structure, systems, and passenger environment to safely and efficiently operate within city streets.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c6995a72cc8190998e56daa6f8e453 |
completed | March 27, 2026, 2:51 p.m. |
Created at: March 27, 2026, 4:03 p.m.