Triple

T769240
Position Surface form Disambiguated ID Type / Status
Subject Wardenclyffe Tower project E16243 entity
Predicate instanceOf P0 FINISHED
Object engineering project C2938 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: engineering project
Context triple: [Wardenclyffe Tower project, instanceOf, engineering project]
  • A. engineering journal
    An engineering journal is a periodical publication that presents peer-reviewed research, technical developments, and practical applications in various fields of engineering.
  • B. engineering library
    An engineering library is a specialized collection of technical resources, including books, journals, standards, and digital tools, that support research, education, and practice in engineering disciplines.
  • C. infrastructure project chosen
    An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
  • D. engineering standard
    An engineering standard is a documented set of agreed-upon technical criteria, methods, and requirements intended to ensure safety, interoperability, quality, and consistency in engineering design, production, and operation.
  • E. engineering division
    The engineering division is an organizational unit responsible for designing, developing, and maintaining technical systems, products, and infrastructure within a company or institution.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a49369a0848190af883934cee3db4c completed March 1, 2026, 7:28 p.m.
Created at: March 1, 2026, 7:37 p.m.