Triple

T7682032
Position Surface form Disambiguated ID Type / Status
Subject Üsküdar E174017 entity
Predicate hasTransport P1298 FINISHED
Object Marmaray line E130705 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Marmaray line | Statement: [Üsküdar, hasTransport, Marmaray line]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Marmaray line
Context triple: [Üsküdar, hasTransport, Marmaray line]
  • A. Marmaray rail tunnel chosen
    The Marmaray rail tunnel is an undersea railway tunnel in Istanbul that connects the European and Asian sides of the city beneath the Bosporus Strait.
  • B. Istanbul–Ankara railway
    The Istanbul–Ankara railway is a major rail corridor in Turkey that connects the country’s largest city, Istanbul, with its capital, Ankara, serving as a key route for both passenger and freight transport.
  • C. Northern Marmara Motorway
    The Northern Marmara Motorway is a major Turkish highway encircling Istanbul on the northern side, designed to ease traffic congestion and improve transit between Europe and Asia.
  • D. Ankara Metro
    Ankara Metro is the rapid transit system serving Turkey's capital city, providing urban rail transportation across Ankara and its surrounding districts.
  • E. Istanbul Metro
    The Istanbul Metro is a rapid transit system serving Istanbul, Turkey, connecting key districts and transport hubs across the city.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c6995840408190a19de6c51090f46f completed March 27, 2026, 2:51 p.m.
NER Named-entity recognition batch_69c70201387c8190afc8479b5a9e21e8 completed March 27, 2026, 10:17 p.m.
NED1 Entity disambiguation (via context triple) batch_69c8a25304b88190920c2e4908925ce2 completed March 29, 2026, 3:53 a.m.
Created at: March 27, 2026, 4:01 p.m.