Triple
T767845
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Power over Ethernet |
E16214
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | power delivery standard |
C3599
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: power delivery standard Context triple: [Power over Ethernet, instanceOf, power delivery standard]
-
A.
power delivery specification
chosen
A power delivery specification defines the technical requirements, limits, and conditions under which electrical power must be supplied, distributed, and regulated within a system or between interconnected systems.
-
B.
IEEE standard
An IEEE standard is a formally documented set of technical specifications and guidelines developed and maintained by the Institute of Electrical and Electronics Engineers to ensure interoperability, safety, and quality across electrical, electronic, and computing technologies.
-
C.
telecommunications standard
A telecommunications standard is an agreed-upon set of technical specifications and protocols that ensure compatibility, interoperability, and reliable communication across different telecom networks and devices.
-
D.
piping standard
A piping standard is a formal specification that defines the materials, dimensions, design, fabrication, testing, and installation requirements for piping systems to ensure safety, compatibility, and performance.
-
E.
serial bus interface standard
A serial bus interface standard defines the electrical, timing, and protocol rules that govern how devices communicate and exchange data over a serial communication bus.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a49369a0848190af883934cee3db4c |
completed | March 1, 2026, 7:28 p.m. |
Created at: March 1, 2026, 7:37 p.m.