Triple

T7668995
Position Surface form Disambiguated ID Type / Status
Subject Kavlico Corporation E173698 entity
Predicate instanceOf P0 FINISHED
Object sensor manufacturer C5242 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: sensor manufacturer
Context triple: [Kavlico Corporation, instanceOf, sensor manufacturer]
  • A. optics company
    An optics company is a business that designs, manufactures, and/or distributes optical products and technologies such as lenses, optical instruments, imaging systems, and related components for various applications.
  • B. manufacturer chosen
    A manufacturer is an entity that produces goods from raw materials or components, typically using machinery and labor, to supply products for distribution and sale.
  • C. scientific instruments company
    A scientific instruments company designs, manufactures, and supplies specialized tools and equipment used for research, analysis, and measurement in scientific and industrial settings.
  • D. manufacturing company
    A manufacturing company is an organization that transforms raw materials or components into finished goods through industrial processes, machinery, and labor for sale to other businesses or consumers.
  • E. drone manufacturer
    A drone manufacturer is a company that designs, produces, and often services unmanned aerial vehicles and related systems for commercial, industrial, or consumer use.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c699562484819086752091e3164a27 completed March 27, 2026, 2:51 p.m.
Created at: March 27, 2026, 4 p.m.