Triple

T7664141
Position Surface form Disambiguated ID Type / Status
Subject Marine Corps leadership publications E173586 entity
Predicate instanceOf P0 FINISHED
Object training publication C11655 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: training publication
Context triple: [Marine Corps leadership publications, instanceOf, training publication]
  • A. training course
    A training course is a structured program of instruction designed to develop specific knowledge, skills, or competencies in learners over a defined period.
  • B. training unit
    A training unit is a structured, self-contained segment of instruction designed to teach specific knowledge, skills, or competencies within a broader training program.
  • C. instructional manual
    An instructional manual is a structured document that provides step-by-step guidance, explanations, and reference information to help users correctly and safely operate, assemble, or understand a product, system, or process.
  • D. training firm
    A training firm is an organization that designs, delivers, and evaluates educational programs to develop individuals’ or organizations’ skills, knowledge, and performance.
  • E. instructional book chosen
    An instructional book is a structured written work designed to teach readers specific skills, knowledge, or procedures through clear explanations, examples, and guided practice.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c699562484819086752091e3164a27 completed March 27, 2026, 2:51 p.m.
Created at: March 27, 2026, 4 p.m.