Triple

T7609647
Position Surface form Disambiguated ID Type / Status
Subject Ports O' Call Village site E172199 entity
Predicate partOfPlanningArea P2160 FINISHED
Object San Pedro Waterfront redevelopment
San Pedro Waterfront redevelopment is a large-scale urban revitalization project aimed at transforming the Los Angeles Harbor’s historic San Pedro waterfront into a modern mixed-use destination with new public spaces, commercial areas, and recreational amenities.
E676995 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: San Pedro Waterfront redevelopment | Statement: [Ports O' Call Village site, partOfPlanningArea, San Pedro Waterfront redevelopment]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: San Pedro Waterfront redevelopment
Context triple: [Ports O' Call Village site, partOfPlanningArea, San Pedro Waterfront redevelopment]
  • A. Astoria waterfront redevelopment
    Astoria waterfront redevelopment is a large-scale urban revitalization initiative transforming the industrial shoreline of Astoria, Queens into a mixed-use residential, commercial, and public waterfront district.
  • B. Tampa downtown waterfront redevelopment
    Tampa downtown waterfront redevelopment is a large-scale urban revitalization initiative transforming the city’s central waterfront into a mixed-use district with offices, residences, retail, and public spaces.
  • C. Southwest Waterfront
    Southwest Waterfront is a revitalized neighborhood along Washington, D.C.’s southwest shoreline, known for its mixed-use development, waterfront parks, and entertainment district The Wharf.
  • D. Marina Park development
    The Marina Park development is a major urban regeneration and public park project in Cork, Ireland, transforming the docklands and riverfront area around Páirc Uí Chaoimh into a large recreational and amenity space.
  • E. Quinta Monroy Housing Project
    Quinta Monroy Housing Project is a pioneering social housing development in Chile that introduced the concept of “incremental” or “half-finished” homes, allowing low-income residents to expand and complete their dwellings over time.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: San Pedro Waterfront redevelopment
Triple: [Ports O' Call Village site, partOfPlanningArea, San Pedro Waterfront redevelopment]
Generated description
San Pedro Waterfront redevelopment is a large-scale urban revitalization project aimed at transforming the Los Angeles Harbor’s historic San Pedro waterfront into a modern mixed-use destination with new public spaces, commercial areas, and recreational amenities.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: San Pedro Waterfront redevelopment
Target entity description: San Pedro Waterfront redevelopment is a large-scale urban revitalization project aimed at transforming the Los Angeles Harbor’s historic San Pedro waterfront into a modern mixed-use destination with new public spaces, commercial areas, and recreational amenities.
  • A. Astoria waterfront redevelopment
    Astoria waterfront redevelopment is a large-scale urban revitalization initiative transforming the industrial shoreline of Astoria, Queens into a mixed-use residential, commercial, and public waterfront district.
  • B. Tampa downtown waterfront redevelopment
    Tampa downtown waterfront redevelopment is a large-scale urban revitalization initiative transforming the city’s central waterfront into a mixed-use district with offices, residences, retail, and public spaces.
  • C. Southwest Waterfront
    Southwest Waterfront is a revitalized neighborhood along Washington, D.C.’s southwest shoreline, known for its mixed-use development, waterfront parks, and entertainment district The Wharf.
  • D. Marina Park development
    The Marina Park development is a major urban regeneration and public park project in Cork, Ireland, transforming the docklands and riverfront area around Páirc Uí Chaoimh into a large recreational and amenity space.
  • E. Quinta Monroy Housing Project
    Quinta Monroy Housing Project is a pioneering social housing development in Chile that introduced the concept of “incremental” or “half-finished” homes, allowing low-income residents to expand and complete their dwellings over time.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c6994f50808190ba228764bb422417 completed March 27, 2026, 2:50 p.m.
NER Named-entity recognition batch_69c6fa1f6e888190ac6580724803fbc3 completed March 27, 2026, 9:43 p.m.
NED1 Entity disambiguation (via context triple) batch_69c868600c7c81909cdeebdb5b2bdaf3 completed March 28, 2026, 11:46 p.m.
NEDg Description generation batch_69c8690ef840819082ecaa16b5cf3f0c completed March 28, 2026, 11:49 p.m.
NED2 Entity disambiguation (via description) batch_69c86b70a51c819091590ff094e6e784 completed March 28, 2026, 11:59 p.m.
Created at: March 27, 2026, 3:54 p.m.