Triple

T760266
Position Surface form Disambiguated ID Type / Status
Subject Namba Station E16052 entity
Predicate railwayLine P848 FINISHED
Object Yamatoji Line E81112 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Yamatoji Line | Statement: [Namba Station, railwayLine, Yamatoji Line]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Yamatoji Line
Context triple: [Namba Station, railwayLine, Yamatoji Line]
  • A. Yamatoji Line chosen
    The Yamatoji Line is a railway line in Japan operated by JR West that connects Osaka with Nara, serving as a key commuter and intercity route in the Kansai region.
  • B. Sennichimae Line
    The Sennichimae Line is a rapid transit line in Osaka, Japan, forming part of the city’s urban subway network.
  • C. Sakaisuji Line
    The Sakaisuji Line is a rapid transit line in Osaka, Japan, forming part of the Osaka Metro network and connecting key districts through north–south underground service.
  • D. Imazatosuji Line
    The Imazatosuji Line is a rapid transit line in Osaka, Japan, operated by Osaka Metro and serving as one of the city’s main north–south subway corridors.
  • E. Nagahori Tsurumi-ryokuchi Line
    The Nagahori Tsurumi-ryokuchi Line is a major Osaka Metro subway line in Osaka, Japan, known for being the country’s first full-scale linear motor-powered urban railway line.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a493684ee48190bd43b7c78da4aec8 completed March 1, 2026, 7:28 p.m.
NER Named-entity recognition batch_69a4a68158508190998da10e69252662 completed March 1, 2026, 8:50 p.m.
NED1 Entity disambiguation (via context triple) batch_69a9338feedc8190bc5f489428babd82 completed March 5, 2026, 7:41 a.m.
Created at: March 1, 2026, 7:37 p.m.