Triple

T758633
Position Surface form Disambiguated ID Type / Status
Subject NLS E16015 entity
Predicate instanceOf P0 FINISHED
Object accessible reading program C3825 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: accessible reading program
Context triple: [NLS, instanceOf, accessible reading program]
  • A. library service for people with disabilities chosen
    A library service for people with disabilities provides accessible materials, adaptive technologies, and personalized support to ensure equitable access to information, resources, and programs.
  • B. program
    A program is a structured set of instructions written in a programming language that a computer can execute to perform specific tasks or solve problems.
  • C. writing program
    A writing program is a software application designed to help users create, edit, organize, and format written content efficiently.
  • D. iconographic program
    An iconographic program is a deliberately organized set of visual images and symbols, often in a specific spatial arrangement, designed to convey a coherent narrative, theological message, or ideological theme.
  • E. academic program
    An academic program is a structured set of courses, requirements, and learning experiences offered by an educational institution that leads to a specific credential, such as a degree, diploma, or certificate.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a493684ee48190bd43b7c78da4aec8 completed March 1, 2026, 7:28 p.m.
Created at: March 1, 2026, 7:37 p.m.