Triple
T7583779
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Navy Region Southwest |
E179556
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | shore installation command |
C10015
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: shore installation command Context triple: [Navy Region Southwest, instanceOf, shore installation command]
-
A.
shore establishment
A shore establishment is a land-based facility that supports naval or maritime operations through administration, logistics, training, maintenance, or other essential services.
-
B.
land component command
A land component command is a military organizational entity responsible for planning, coordinating, and executing land-based operations within a joint or combined force.
-
C.
naval component command
A naval component command is a subordinate joint force command responsible for planning, directing, and coordinating naval operations within a designated theater or area of responsibility.
-
D.
supporting establishment command
chosen
A supporting establishment command is a military or organizational unit responsible for providing logistical, administrative, and operational support to primary mission-focused forces or facilities.
-
E.
harbor
A harbor is a sheltered body of water, often equipped with docks and facilities, where ships can anchor safely for loading, unloading, and protection from rough seas.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c69f327db881909a21ae3b156f8ded |
completed | March 27, 2026, 3:16 p.m. |
Created at: March 27, 2026, 3:52 p.m.