Triple

T7583779
Position Surface form Disambiguated ID Type / Status
Subject Navy Region Southwest E179556 entity
Predicate instanceOf P0 FINISHED
Object shore installation command C10015 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: shore installation command
Context triple: [Navy Region Southwest, instanceOf, shore installation command]
  • A. shore establishment
    A shore establishment is a land-based facility that supports naval or maritime operations through administration, logistics, training, maintenance, or other essential services.
  • B. land component command
    A land component command is a military organizational entity responsible for planning, coordinating, and executing land-based operations within a joint or combined force.
  • C. naval component command
    A naval component command is a subordinate joint force command responsible for planning, directing, and coordinating naval operations within a designated theater or area of responsibility.
  • D. supporting establishment command chosen
    A supporting establishment command is a military or organizational unit responsible for providing logistical, administrative, and operational support to primary mission-focused forces or facilities.
  • E. harbor
    A harbor is a sheltered body of water, often equipped with docks and facilities, where ships can anchor safely for loading, unloading, and protection from rough seas.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c69f327db881909a21ae3b156f8ded completed March 27, 2026, 3:16 p.m.
Created at: March 27, 2026, 3:52 p.m.