Triple
T7582425
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Solid Waste Management Administration |
E179520
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | public works division |
C122
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: public works division Context triple: [Solid Waste Management Administration, instanceOf, public works division]
-
A.
public works ministry
A public works ministry is a government department responsible for planning, developing, and maintaining public infrastructure and services such as roads, bridges, water systems, and public buildings.
-
B.
public works department in California
A public works department in California is a local government agency responsible for planning, building, operating, and maintaining public infrastructure and services such as roads, bridges, water systems, and public facilities in compliance with state and local regulations.
-
C.
static division
Static division is a conceptual class representing a fixed, unchanging partition of a whole into distinct, predefined segments that do not vary over time or context.
-
D.
engineering division
The engineering division is an organizational unit responsible for designing, developing, and maintaining technical systems, products, and infrastructure within a company or institution.
-
E.
public office
chosen
A public office is an official position of authority and responsibility within a government or public institution, held to serve the interests and welfare of the public under established laws and regulations.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c69f327db881909a21ae3b156f8ded |
completed | March 27, 2026, 3:16 p.m. |
Created at: March 27, 2026, 3:52 p.m.